The pioneer of “2W & 3W Manufacturer and Exporter” initiated its journey in Bangladesh since 2000. RUNNER as a trusted brand through satisfying customers needs, & services at an affordable price with Latest technology.
CHALLENGE
•Difficult to control the shop wise cost. (Actual vs Standard)
•Automatic PR requisition based on the BOM/Production plan
•Compare Production plan and actual production with Shop wise downtime, scrap record.
•Proper analysis of Quality control during purchase , manufacturing.
•Tracking delivery accessories & Transport cost per Customer order
•FIFO & FEFO wise RM issue & FG delivery
•Approval routing for Asset, Inventory part purchase withing budget limit
•Verify & Validate Engine & chassis number with Matching list before Assembled.
•LC number wise each bike cost break down (RM cost, Charge, FG cost)
SOLUTION
•Standard cost setup of BOM/Routing and verify with shop order cost
•Setup safety stock , Min Lot size etc. by selecting planning method
•Configure the production plan upload through excel, shop order, scrap factor
•Control plan set up for purchased & manufactured item
•Configure delivery note analysis and gate pass
•Setup expiry and first receive date for all products.
•Build a approval routing for local & foreign purchase
•Setup barcode print & scanning during assembled
•Configure and Developed a report.
RESULT
•Analyze the cost variance & take corrective actionon it.
•Reduce manual effort and increase efficient to make decision.
•Easily track actual production qty variance for downtime/scrap.
•Quality defective product can not be delivered to the customer.
•Control delivery cost per customer
•User can not issue and deliver FG as per LIFO/LEFO
•Without approval of hierarchy no one can create PO withing budget limit
•No change to assembled unmatched vehicle
•Visible for cost analysis of model & LC wise